ADINE is a FP6-TREN-4 project under execution between October 2007 and September 2010.
The problem - need for the project Considerable amount of renewable energy in Europe represents Distributed Electricity Generation (DG). However, the electricity distribution systems have been designed without considering interconnection of DG. One of the main barriers to the penetration of DG at the distribution network level is the complexity of the interconnection process of DG into the network.
The solution developed in the project This project develops, demonstrates and validates a new method for the active management of a distribution network and the enabling solutions to support it. The solutions operate as active components in managing the network to enable an easy interconnection of different DG units. The solutions cover the protection of the network, planning and information systems, and voltage and reactive power control.
Partners in the project are:
- Hermia Ltd in Tampere, Finland
- AREVA T&D Ltd, Finland
- ABB Oy Distribution Automation, Finland
- AREVA Energietechnik GmbH, Germany
- ComPower Ab, Sweden
- Tampere University of Technology, Department of Electrical Energy Engineering
- Lund University, Department of Electrical Measurements and Industrial Electrical Engineering and Automation, Sweden
New information in workshop-page: Materials of Smart Grid Demonstration seminar
We have dissemination workshops in Germany, UK, Portugal ans Spain in May and June 2010. Welcome!
We encourage you to join the project email list to keep yourself updated about the project achievements.
|